HRERA verifiedReg 223 OF 2017 DATED 18.09.2017Valid to 30/04/2024TCP licence 16 of 2009
1 / 1
Under ConstructionBuyPast completion dateOngoing project

Zen Residences

AIPLGurugram, Sector 70A

Price on request

HRERA filings carry no unit pricing — we confirm the current band with the developer.

98215 53693WhatsApp

RERA registered — 223 OF 2017 DATED 18.09.2017, valid to 30/04/2024

Land area
3.41 acres
Units filed
226
Unsold
73
Declared completion
Apr 2023
Built
51%
Project cost
₹219.04 Cr

Availability

REP-I Part C
Booked 153Unsold 73Sold through 67.7%

The promoter declared 73 unsold units in its last filing. Availability moves between quarterly filings — ask us to confirm current stock before you commit.

Configurations

REP-I Part C
  • 2bhk+2t
  • 3bhk+3t

Delivery status

REP-I Part C
Infrastructure
51%
Declared completion
Apr 2023
Status
Overdue
Layout approved
18-05-2021
Building plan
18-05-2021

The completion date the promoter filed has already passed, with infrastructure reported 51% complete. Treat the handover date as unmet until a fresh quarterly progress report says otherwise.

Approvals & compliance

REP-I Part E

Statutory approvals: 7 obtained, 0 pending

Roads
HUDA · approved
Electricity
DHBVN · approved
Water Supply
GMDA · approved
Sewage Disposal
HUDA · approved
Storm Water Drainage
HUDA · approved

Agency sign-off for external connections stands at 5 of 5 obtained. Internal approvals and external connections are separate gates — worth raising both before you book.

Amenities

REP-I Part C
  • Construction of Circulation Road
  • Electrical Substation
  • Electricity Supply System
  • Internal Roads and Pavements
  • Rain Water Harvesting
  • Sewage Treatment & Garbage Disposal
  • Storm Water Drainage
  • STP
  • Street Lighting
  • Underground Water Tank
  • Water Supply System

These are the facilities the promoter costed into its service plan estimates — not a marketing list. Parking bays filed: 401.

Licence & legal

REP-I Part B
RERA registration
223 OF 2017 DATED 18.09.2017
Valid up to
30/04/2024
Town planning licence
16 of 2009
Licensee on record
Haamid Real Estates Pvt. Ltd.
Promoter is licensee
No
Promoter CIN
U45209HR1997PLC080240
Permissible FAR
175%
Proposed FAR
175%
Litigation declared
Yes

The land licence is held by Haamid Real Estates Pvt. Ltd., not by the promoter. That is normal for a collaboration project, but it means the agreement chain runs through two entities — check both before signing.

About this project

Zen Residences is a group housing project by Advance India Projects Limited in Sector 70A, Gurugram, registered with the Haryana Real Estate Regulatory Authority under 223 OF 2017 DATED 18.09.2017. The promoter has declared a project area of 3.41 acres. Of the 226 units filed, 153 were booked and 73 remained unsold at the date of the filing. All 7 statutory approvals listed in the filing are recorded as obtained. Agency sign-off for external services stands at 5 of 5 — covering roads, water, electricity, sewage and storm-water drainage. The completion date filed with the authority was Apr 2023, with infrastructure reported 51% complete — that date has now passed. It is developed on town-planning licence 16 of 2009. The land licence is held by Haamid Real Estates Pvt. Ltd., with the promoter developing under a collaboration arrangement. All figures are as declared by the promoter to HRERA Gurugram and are not independently verified.

Location

REP-I Part A

Gurugram, Sector 70A

Open in Google Maps

Every figure on this page is as declared by the promoter to HRERA Gurugram — Form REP-I and is not independently verified by us. Registration status and availability can change between filings. View the source filing.

You May Also Like

Similar Properties

Advisor consultation

One Conversation, Clearer Next Steps

Still deciding where to begin?

Speak with a Gurugram specialist and get a practical next step for buying, selling, leasing or investing.

Call 98215 53693